
Métropole Nice Côte d'Azur · Alpes-Maritimes · Provence-Alpes-Côte d'Azur · 20,277 residents · Mayor: Anne Sattonnet
Vence
€31.2 million spent in 2025.
€1,540 per resident · Towns of the same size: €1,855
Vence’s spending by policy area
Click a line to see what it pays for
Source: the town’s 2025 accounts (DGFiP), by public policy.
Where the money goes
The €31.2M spent in 2025, by who receives it.
Source: the town’s 2025 accounts (DGFiP).
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid. Purchases, services and works paid to companies by the town in 2025: €11.5M (its accounts).
Click a name to see its contracts
- Association Apreh (les Oliviers du Taouro)2 contracts over 12 months to 3 years · at most ~€583k a year on average · framework agreements: maximum envelopesup to €1.3M
- Entreprise Scoffier Freres6 contracts over 1 month to 12 months · at most ~€902k a year on average · 2 of them framework agreements (maximum envelopes)up to €902k
- BD Batideco2 contracts over 2 months to 5 months · at most ~€692k a year on averageup to €692k
- Atrium la Pepiniere (la Pepiniere)4 contracts over 1 month to 12 months · framework agreements: maximum envelopesup to €600k
- Avenir Deconstruction2 contracts over 1 month to 12 months · framework agreements: maximum envelopesup to €500k
- SO.CO.RENOV2 contracts over 1 month to 4 months · at most ~€436k a year on averageup to €436k
- EURL Charpente et Création3 contracts over 1 month to 4 monthsup to €393k
73 contracts signed in 2025 · €8.4M before tax · All contracts
Why this total differs from the €11.5M of purchases, services and works paid to companies
These are the amounts of the contracts signed in the year, over their whole length, not what was paid. The money paid in a year also goes to older contracts and to purchases too small to be published (under €40,000 excl. VAT). For a framework agreement, the amount is a ceiling.
Investment and works
€6.4M of capital spending in 2025 (building, renovation, equipment), €315 per resident. Towns of the same size: €372.
Click a building site to see the contract
- Maîtrise d’œuvre pour la rénovation et la couverture de la piscine Jean Maret2024 · Culture, sport and youth · Lasa Laboratoire d Applications des Sciences Acoustiques€788k
- Démolition2025 · 2 contracts€699k
- Création et rénovation d’espaces verts2024 · Town planning and housing · Paysages Mediterraneens€600k
- Démolition, gros œuvre et maçonneries2024 · BD-V Bat€552k
- Démolition de 22 villas2023 · DSD€499k
Largest works contracted since 2023, among published contracts. Amounts planned at signature, often spread over several years.
In addition, €34k given to other bodies for their own equipment (joint funding, energy syndicate…).
Source: the town’s 2025 accounts (DGFiP), by public policy.
Revenue and financing
Revenue: €28.8M · borrowing: €2M · spending: €31.2M.
Source: the town’s 2025 accounts (DGFiP).
Debt and taxation
Accounts 2025, main budget (excluding annex budgets such as water), except debt and savings: main and annex budgets together (OFGL consolidated accounts). Per resident: amount divided by the total population (Insee, in force in the year of the accounts). Sources: DGFiP, OFGL. “Towns of the same size”: median of the 359 towns of 20,000 to 50,000 inhabitants.
Who spends for the residents of Vence
Spending per resident in 2025 of each public body the town belongs to, and what each one pays for.
- TownVencePrimary schools, canteens, local streets, civil registry€1,540 per resident
- IntercommunalityMétropole Nice Côte d'AzurWaste, water, urban transport, economic development€1,190 per resident
- DépartementAlpes-MaritimesMinimum income, elderly and disability care, middle schools, county roads€1,300 per resident
- RegionProvence-Alpes-Côte d'AzurHigh schools, regional trains, training, business support€558 per resident
Each amount is what the body spends per resident, from its accounts (DGFiP). Do not add them up: part of the money passes from one body to another.
Understanding these figures
Running costs and works: what is the difference?
Running costs are each year’s spending: wages, energy, upkeep, grants. Works create or renovate something that lasts: a school, a road, a sports hall.
How is the comparison with towns of the same size made?
The towns of 20,000 to 50,000 inhabitants are ranked from lowest to highest value; the median is the value in the middle. A value above or below the median is not a judgement: it depends on the area, the population and the powers held by the intercommunality.
Where do these figures come from?
From the town’s accounts kept by the public accountant (DGFiP), the local finance observatory (OFGL) and public procurement data. Qipu changes no amount.
Elected officials and staff of Vence: to report a figure to correct or add context, write to Qipu.
Compare with Mougins or with another town:
Page published by Qipu, independent of the town · Sources and method
DGFiP balance-sheet accounts (nature axis) · OFGL (consolidated towns base) · Public procurement — DECP (data.gouv.fr) · National register of elected officials, archived versions 2020-2025 · 2025. The method · See the source