Skip to main content

Public contracts of Vénissieux · 2020 · Construction and buildings

Groupe scolaire Moulin à Vent : réhabilitation du bâtiment A et salles de classe

€311k
maximum contract amount over 11 months — what was paid on it is not published
Signed on 19 October 2020 · ended around September 2021 · 11 months

Who won it

Pierres ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Lyon (69009) · headcount 20 to 49 employees · SIREN 392462115

Number 9 by amount of the 45 contracts Vénissieux published for 2020. It belongs to the policy Schools.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : 3

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.

Groupe scolaire Moulin à Vent : réhabilitation du bâtiment A et…: up to €311k over 11 months, Vénissieux 2020 · Qipu