Skip to main content

Public contracts of Vénissieux · 2025 · Construction and buildings

Travaux de sécurisation des préaux des groupes scolaires de la ville de Vénissieux

€258k
maximum contract amount over 13 months — what was paid on it is not published
Signed on 7 July 2025 · ended around August 2026 · 13 months

That is at most ~€238k a year on average: a maximum too.

Company selected

Peixoto MetallerieFabrication de structures métalliques et de parties de structures · registered office Saint-Genis-Laval (69230) · headcount 3 to 5 employees · SIREN 528694946

Number 32 by amount of the 93 contracts Vénissieux published for 2025. It belongs to the policy Schools.

Other contracts of Peixoto Metallerie in Vénissieux

Gs moulin a vent2020 · maximum over 11 months85€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 1

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.