Maîtrise d’oeuvre portant sur les travaux de requalification de la rue Saint Pierre

€54k
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 26 April 2021 · ended around July 2023 · 2.5 yrs

That is at most ~€24k a year on average: a maximum too.

Who won it

Archange IngenierieIngénierie, études techniques · registered office Auneuil (60390) · SIREN 440618510

Number 3 by amount of the 6 contracts Verberie published for 2021.

Other contracts of Archange Ingenierie in Verberie

MO requalification rue St Pierre2021 · maximum over 4 months54€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.

Maîtrise d’oeuvre portant sur les travaux de requalification de la…: up to €54k over 2.5 years, Verberie 2021 · Qipu