Skip to main content

Public contracts of Villard-Bonnot · 2021 · Construction and buildings

Restructuration et extension des anciens locaux de la CPAM et aménagement de l’école de musique

€155k
maximum contract amount over 14 months — what was paid on it is not published
Signed on 15 March 2021 · ended around May 2022 · 14 months

That is at most ~€133k a year on average: a maximum too.

Company selected

MRB (M.R.B.)Travaux de maçonnerie générale et gros œuvre de bâtiment · registered office Saint-Martin-Le-Vinoux (38950) · headcount 20 to 49 employees · SIREN 418550166

The largest of the 16 contracts Villard-Bonnot published for 2021. It belongs to the policy Schools.

Other contracts of MRB (M.R.B.) in Villard-Bonnot

Construction de la brigade de la gendarmerie2019 · maximum over 16 months22€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.