Supplier of Villenave-d'Ornon · Construction and buildings
Gta
Gta holds 4 public contracts awarded by Villenave-d'Ornon between 2024 and 2025. That is 1% of the value of the contracts the town awarded over the period.
head office in Merignac (33) · 10 to 19 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 350220661
Its contracts in Villenave-d'Ornon
Maximum amount of each contract, over its whole term: not what was paid.
Gros œuvre et voirie et réseaux divers2025 · maximum over 10 months · Simplified procedure€307kSalle polyvalente : installation de chantier, gros œuvre, voirie…2025 · maximum over 10 months · Simplified procedure€274kDescription des travaux de construction des nouveaux bureaux des…GROS oeuvre · 2024 · maximum over 14 months · at most ~€37k a year on average · Simplified procedure€44kGros œuvre2024 · maximum over 11 months · Simplified procedure€44kYear by year
Elsewhere in France
Gta holds contracts in 6 towns, worth €2.9M at award.