Supplier of Villeneuve-d'Ascq · Construction and buildings
BCR Etancheite
BCR Etancheite holds 3 public contracts awarded by Villeneuve-d'Ascq between 2024 and 2025. That is 3% of the value of the contracts the town awarded over the period.
head office in Seclin (59) · 20 to 49 employees · Travaux d'étanchéification · SIREN 800209710
Its contracts in Villeneuve-d'Ascq
Maximum amount of each contract, over its whole term: not what was paid.
Rénovation de différents équipements du centre nautique Babylone2025 · maximum over 3 months · Simplified procedure€186kTravaux de rénovation des couvertures et étanchéités 20252025 · maximum over 2 months · Simplified procedure€97kTravaux de rénovation des couvertures et étanchéités 20242024 · maximum over 3 months · Simplified procedure€194kYear by year
Elsewhere in France
BCR Etancheite holds contracts in 5 towns, worth €1.1M at award.