Skip to main content

Public contracts of Villeneuve-le-Roi · 2021 · Construction and buildings

Travaux de réfection de la couverture zinc du bâtiment principal R+2 de l’école Jean Moulin

€181k
maximum contract amount over 4 months — what was paid on it is not published
Signed on 19 July 2021 · ended around November 2021 · 4 months

Company selected

Isolation Toiture Etancheite CouvertureTravaux d'étanchéification · registered office Paris (75019) · headcount 50 to 99 employees · SIREN 320290851

Number 17 by amount of the 79 contracts Villeneuve-le-Roi published for 2021. It belongs to the policy Schools.

Other contracts of Isolation Toiture Etancheite Couverture in Villeneuve-le-Roi

Travaux de réfection de la couverture zinc du bâtiment R+1…2022 · maximum over 5 months151€kTravaux de couverture zinc2022 · maximum over 8 months20€kCouverture2020 · maximum over 9 months349€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.