Supplier of Villers-lès-Nancy · Construction and buildings
Actea
Actea holds 2 public contracts awarded by Villers-lès-Nancy between 2025 and 2026. That is 1% of the value of the contracts the town awarded over the period.
head office in Wasselonne (67) · 50 to 99 employees · Fabrication d'éléments en matières plastiques pour la construction · SIREN 310634696
Its contracts in Villers-lès-Nancy
Maximum amount of each contract, over its whole term: not what was paid.
Pose de châssis PVC pour divers bâtiments communaux ; lot unique2026 · maximum over 4 months · Simplified procedure€26kRénovation énergétique et mise en accessibilité de l’hôtel de ville…2025 · maximum over 5 months · Simplified procedure€32k