Skip to main content

Public contracts of Villeurbanne · 2019 · Construction and buildings

Mise en conformité accessibilité et sécurité du centre social cyprian les brosses et restructuration de la crèche Babil’home

€56k
maximum contract amount over 22 months — what was paid on it is not published
Signed on 21 August 2019 · ended around June 2021 · 22 months

That is at most ~€30k a year on average: a maximum too.

Company selected

Climatisation Chauffage Sanitaire SifferTravaux d'installation d'eau et de gaz en tous locaux · registered office Brignais (69530) · SIREN 956510184

Number 55 by amount of the 84 contracts Villeurbanne published for 2019. It belongs to the policy Health and social care.

Other contracts of Climatisation Chauffage Sanitaire Siffer in Villeurbanne

Extension de l’école maternelle du groupe scolaire Louis Pasteur2018 · maximum over 17 months291€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.