Supplier of Volmerange-les-Mines · Construction and buildings
Petitdan Solutions
Petitdan Solutions holds 3 public contracts awarded by Volmerange-les-Mines in 2019. That is 18% of the value of the contracts the town awarded in 2019.
head office in Volmerange-Les-Mines (57) · Autres travaux de finition · SIREN 520506742
€35k
at most, over the whole term of the contracts awarded by Volmerange-les-Mines in 2019
Its contracts in Volmerange-les-Mines
Maximum amount of each contract, over its whole term: not what was paid.
Rénovation des vestiaires du stade de footballCommune de Volmerange-les-Mines: · Électricité · 2019 · maximum over 12 months · Simplified procedure€18kRénovation des vestiaires du stade de footballCommune de Volmerange-les-Mines: · Revetement de facade · 2019 · maximum over 5 months · Simplified procedure€12kRénovation des vestiaires du stade de footballCommune de Volmerange-les-Mines: · GROS oeuvre · 2019 · maximum over 5 months · Simplified procedure€5k