Supplier of Voujeaucourt · Construction and buildings
Carrara Freres
Carrara Freres holds 2 public contracts awarded by Voujeaucourt between 2024 and 2025. That is 8% of the value of the contracts the town awarded over the period.
head office in Audincourt (25) · 10 to 19 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 491258216
€195k
at most, over the whole term of the contracts awarded by Voujeaucourt in 2025
Its contracts in Voujeaucourt
Maximum amount of each contract, over its whole term: not what was paid.
Démolitions et gros œuvre2025 · maximum over 14 months · at most ~€167k a year on average · Simplified procedure€195kRequalification des locaux de la crèche La Pomme Bleue : gros œuvre2024 · maximum over 14 months · at most ~€167k a year on average · Simplified procedure€195kYear by year
2025€195 k
2024€195 k