Skip to main content

Public contracts of Wittelsheim · 2024 · Construction and buildings

Restructuration de l’École du Centre et Création d’un périscolaire-07 Toiture

Etanchéité · Zinguerie · Bardage

€332k
maximum contract amount over 18 months — what was paid on it is not published
Signed on 15 February 2024 · ended around August 2025 · 18 months

That is at most ~€221k a year on average: a maximum too.

Company selected

Entreprise GalopinTravaux de couverture par éléments · registered office Mulhouse (68200) · headcount 20 to 49 employees · SIREN 337572119

Number 10 by amount of the 47 contracts Wittelsheim published for 2024. It belongs to the policy Schools.

Other contracts of Entreprise Galopin in Wittelsheim

Périscolaire de l’école du Centre : toiture2024 · maximum over 23 months329€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.