Wikimedia Commons · Photograph by Mike Peel (www.mikepeel.net). · CC BY-SA 4.0Pier 27 has been rebuilt around whatever the waterfront needed at the time. The Port's own 1980 handbook lists Piers 27-29 as a breakbulk terminal — three berths, fifteen acres, 335,830 square feet of covered storage, worked by the Pacific-Oriental Terminal Company and serving Argentine, Philippine and Dutch lines. By the time of the Waterfront Land Use Plan those cargo activities had been consolidated at Pier 80, the piers were designated a transitional maritime area, and the sites were being used for interim non-trust purposes. What replaced the cargo was an event and cruise complex: the Port Commission tracked the Pier 27 cruise terminal for use during the 34th America's Cup, approved revenue bonds for a second phase of the James R. Herman Cruise Terminal, and considered a donor recognition programme at Piers 27/29. The environmental report for that combined project deals in the detail such a shift produces — noise monitoring on Telegraph Hill about 750 feet from the Pier 27 waterfront, and a mitigation measure requiring acoustical enclosures for generators at the Pier 27-29 spectator areas. The contracts recorded against the pier by name are for its public art.
Archive coverage for this place is limited — only 4 matched documents so far, so this summary stays short rather than padded.
Pier 27 · City-owned · 436,042 sq ft · 5 buildings on site · parcel 9900070 · District 3 · City Facilities registry
Every line opens that contract’s own page, with its spend curve and its subcontractors. Agreed amounts are ceilings, not spending.
Run by the Port, whose whole-department budget is $156.4M across 304 staff (FY2025) — citywide, not this place’s own. The City does not publish a running cost per building.
The environmental report for the terminal and America's Cup, with noise limits for generators at the pier.
Draft environmental impact report : the 34th America's Cup & James R. Herman Cruise Terminal and Northeast Wharf Plaza · 2011 ↗Internet Archive — San Francisco Public Library partnership scansThe Port's handbook describing Piers 27-29 as a working breakbulk terminal with fifteen acres of cargo space.
The port ↗Internet Archive — San Francisco Public Library partnership scans
2 procedural records — minutes, agendas, calendars — not listed.