Skip to main content

Public contracts of Albertville · 2019 · Construction and buildings

Réfection des planchers bois de l’école élémentaire Raymond Noël

€12k
maximum contract amount over 7 months — what was paid on it is not published
Signed on 2 September 2019 · ended around April 2020 · 7 months

Company selected

Sanitech Ac PlomberieTravaux d'installation d'eau et de gaz en tous locaux · registered office Ugine (73400) · headcount 6 to 9 employees · SIREN 823609896

Number 79 by amount of the 84 contracts Albertville published for 2019. It belongs to the policy Schools.

Other contracts of Sanitech Ac Plomberie in Albertville

Restructuration des locaux du service financier2022 · maximum over 4 months16€kRestructuration et extension de la maison Mathias2019 · maximum over 2 months70€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.