Skip to main content

Public contracts of Albertville · 2019 · Construction and buildings

Restructuration et extension de la maison Mathias

€70k
maximum contract amount over 2 months — what was paid on it is not published
Signed on 18 April 2019 · ended around June 2019 · 2 months

Company selected

Sanitech Ac PlomberieTravaux d'installation d'eau et de gaz en tous locaux · registered office Ugine (73400) · headcount 6 to 9 employees · SIREN 823609896

Number 29 by amount of the 84 contracts Albertville published for 2019. It belongs to the policy Streets and transport.

Other contracts of Sanitech Ac Plomberie in Albertville

Restructuration des locaux du service financier2022 · maximum over 4 months16€kRéfection des planchers bois de l’école élémentaire Raymond Noël2019 · maximum over 7 months12€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.