Skip to main content

Public contracts of Besançon · 2025 · Construction and buildings

Rénovation extension de l’école de la butte a Besançon

Sol souple

€59k
maximum contract amount over 23 months — what was paid on it is not published
Signed on 14 May 2025 · running until about April 2027 · 23 months
Ongoing14 Apr 2027

That is at most ~€31k a year on average: a maximum too.

Company selected

BFC RevetementTravaux de revêtement des sols et des murs · registered office Ecole-Valentin (25480) · headcount 3 to 5 employees · SIREN 839102597

Number 190 by amount of the 226 contracts Besançon published for 2025. It belongs to the policy Schools.

Other contracts of BFC Revetement in Besançon

Travaux pour la réhabilitation lourde de l’école élémentaire paul bert2025 · maximum over 2.5 years113€kRénovation extension de l’école de la butte a Besançon2025 · maximum over 23 months77€kTravaux crèche st ferjeux2023 · maximum over 13 months45€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.