Public contracts of Besançon · 2025 · Construction and buildings

Travaux pour la réhabilitation lourde de l’école élémentaire paul bert

Revêtements de sol · Carrelage · Faïence

€113k
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 24 June 2025 · running until about November 2027 · 2.5 yrs
Ongoing24 Nov 2027

That is at most ~€47k a year on average: a maximum too.

Company selected

BFC RevetementTravaux de revêtement des sols et des murs · registered office Ecole-Valentin (25480) · headcount 3 to 5 employees · SIREN 839102597

Number 139 by amount of the 226 contracts Besançon published for 2025. It belongs to the policy Schools.

Other contracts of BFC Revetement in Besançon

Rénovation extension de l’école de la butte a Besançon2025 · maximum over 23 months77€kRénovation extension de l’école de la butte a Besançon2025 · maximum over 23 months59€kTravaux crèche st ferjeux2023 · maximum over 13 months45€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.