Skip to main content

Public contracts of Bolbec · 2021 · Construction and buildings

Travaux de couverture du

Couverture école pierre corneille

€93k
maximum contract amount over 6 months — what was paid on it is not published
Signed on 8 November 2021 · ended around May 2022 · 6 months

Company selected

Durand FilsTravaux de couverture par éléments · registered office Le Houlme (76770) · headcount 100 to 199 employees · SIREN 513843631

Number 6 by amount of the 14 contracts Bolbec published for 2021. It belongs to the policy Schools.

Other contracts of Durand Fils in Bolbec

Travaux de couverture sur la salle lechaptois2024 · maximum over 3 months31€kTravaux de couverture ardoise : salle lechaptois2023 · maximum over 5 months35€kTravaux de couverture ardoises : Salle Lechaptois2023 · maximum over 5 months35€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.