Skip to main content

Public contracts of Bonifacio · 2022 · Construction and buildings

Construction d’un centre multi accueil

Peintures: · Construction d’un centre multi accueil · Peintures

€74k
maximum contract amount over 1 month — what was paid on it is not published
Signed on 21 December 2022 · ended around January 2023 · 1 month

Company selected

MGTravaux de plâtrerie · registered office Sotta (20146) · headcount 20 to 49 employees · SIREN 508572229

Number 13 by amount of the 33 contracts Bonifacio published for 2022.

Other contracts of MG in Bonifacio

Rénovations intérieures et extérieures de l’hôtel de ville : plâtrerie…2025 · maximum over 7 months154€kRénovation des toitures de l’hôtel de ville2023 · maximum over 3 months67€kRénovation des toitures de l’hôtel de ville2023 · maximum over 3 months67€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.