Skip to main content

Public contracts of Bonifacio · 2023 · Construction and buildings

Rénovation des toitures de l’hôtel de ville

Ouvrages plâtres, peinture: · Rénovation des toitures de l’hôtel de ville · Ouvrages plâtres, peinture

€67k
maximum contract amount over 3 months — what was paid on it is not published
Signed on 26 June 2023 · ended around September 2023 · 3 months

Company selected

MGTravaux de plâtrerie · registered office Sotta (20146) · headcount 20 to 49 employees · SIREN 508572229

Number 21 by amount of the 30 contracts Bonifacio published for 2023.

Other contracts of MG in Bonifacio

Rénovations intérieures et extérieures de l’hôtel de ville : plâtrerie…2025 · maximum over 7 months154€kRénovation des toitures de l’hôtel de ville2023 · maximum over 3 months67€kConstruction d’un centre multi accueil2022 · maximum over 1 month74€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.