Skip to main content

Public contracts of Bouguenais · 2022 · Construction and buildings

Restructuration des sanitaires des écoles maternelle Dolto, maternelle et élémentaire Fougan de Mer à Bouguenais

Menuiseries Intérieures · Cloisons · Faux Plafonds

€72k
maximum contract amount over 4 months — what was paid on it is not published
Signed on 9 June 2022 · ended around October 2022 · 4 months

Company selected

Sogea Atlantique BTP (Sisteo)Construction d'autres bâtiments · registered office Saint-Herblain (44800) · headcount 250 to 499 employees · SIREN 501383251

Number 34 by amount of the 55 contracts Bouguenais published for 2022. It belongs to the policy Schools.

Other contracts of Sogea Atlantique BTP (Sisteo) in Bouguenais

Travaux relatifs a l’extension de la gendarmerie de Bouguenais2023 · maximum over 10 months79€kMise en accessibilité PMR d’établissements recevant du public, tranche…2019 · maximum over 7 months250€kRestructuration des sanitaires du Bâtiment H2019 · maximum over 2 months48€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.