Public contracts of Bouguenais · 2019 · Construction and buildings

Restructuration des sanitaires du Bâtiment H

École Elémentaire Urbain le Verrier: · Gros oeuvre · Réseaux · Menuiseries · Faux plafonds · Cloisons · Doublage

€48k
maximum contract amount over 2 months — what was paid on it is not published
Signed on 14 June 2019 · ended around August 2019 · 2 months

Company selected

Sogea Atlantique BTP (Sisteo)Construction d'autres bâtiments · registered office Saint-Herblain (44800) · headcount 250 to 499 employees · SIREN 501383251

Number 30 by amount of the 53 contracts Bouguenais published for 2019.

Other contracts of Sogea Atlantique BTP (Sisteo) in Bouguenais

Travaux relatifs a l’extension de la gendarmerie de Bouguenais2023 · maximum over 10 months79€kRestructuration des sanitaires des écoles maternelle Dolto…2022 · maximum over 4 months72€kMise en accessibilité PMR d’établissements recevant du public, tranche…2019 · maximum over 7 months250€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.