Public contracts of Bouguenais · 2019 · Construction and buildings
Travaux d’insonorisation de 3 sites de la ville de Bouguenais
Isolation
That is at most ~€27k a year on average: a maximum too.
Company selected
Sogea Atlantique BTP (Sisteo)Construction d'autres bâtiments · registered office Saint-Herblain (44800) · headcount 250 to 499 employees · SIREN 501383251Number 36 by amount of the 53 contracts Bouguenais published for 2019.
Other contracts of Sogea Atlantique BTP (Sisteo) in Bouguenais
Travaux relatifs a l’extension de la gendarmerie de Bouguenais2023 · maximum over 10 months79€kRestructuration des sanitaires des écoles maternelle Dolto…2022 · maximum over 4 months72€kMise en accessibilité PMR d’établissements recevant du public, tranche…2019 · maximum over 7 months250€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Ferme et actualisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.