Skip to main content

Public contracts of Bourges · 2020 · Construction and buildings

Dépôt des jardiniers des gibjoncs construction d’un espace de vestiaires

Gros oeuvre

€64k
maximum contract amount over 13 months — what was paid on it is not published
Signed on 9 November 2020 · ended around December 2021 · 13 months

That is at most ~€59k a year on average: a maximum too.

Company selected

SAS CazinTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Les Aix-D'Angillon (18220) · headcount 20 to 49 employees · SIREN 391981461

Number 38 by amount of the 51 contracts Bourges published for 2020.

Other contracts of SAS Cazin in Bourges

Réfection du bloc sanitaire au centre de loisirs les millains2025 · maximum over 10 months42€kGroupe scolaire gibjoncs rénovation du bâtiment périscolaire paul…2025 · maximum over 19 months41€kConstruction d’un centre municipal de santé2024 · maximum over 12 months73€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.