Bruay-la-Buissière: spending by policy area · 2025
Town planning and housing
€7M
16% of 2025 spending · €311 per resident
€8M in 2024
Breakdown of this item’s spending
Click a line to see what it is made of
The 2 other items (< 1%)
Largest works since 2023
Click a building site to see the contract
- Rénovation énergétique des installations d’éclairage extérieur2025 · Eiffage Énergie Systemes - Infra Nord€500k
- Rénovation des espaces Publics de la Cité Anatole FRANCE : · Espaces verts · Mobilier urbain2025 · Flandres Artois Paysage€323k
- Achat de produits horticoles pour travaux d’espaces verts2025 · LF€73k
Who won this item’s contracts since 2023
Compared with towns of the same size
11.9% of the town’s running costs goes to this item. Towns of the same size: 7.1%.