Skip to main content

Public contracts of Châlette-sur-Loing · 2025 · Construction and buildings

Construction du complexe sportif Paul Éluard

€1.9M
maximum contract amount over 15 months — what was paid on it is not published
Signed on 23 July 2025 · ended around October 2026 · 15 months

That is at most ~€1.5M a year on average: a maximum too.

Company selected

Établissements Pierre RevilTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Pannes (45700) · headcount 50 to 99 employees · SIREN 309979813

A contract awarded to 4 holders; above, the main holder. With it: Entreprise de Peinture Neyrat, Bidet SASU, SARL Bethoul LB. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 2 by amount of the 52 contracts Châlette-sur-Loing published for 2025. It belongs to the policy Culture, sport and youth.

Other contracts of Établissements Pierre Revil in Châlette-sur-Loing

Déplacement d’un bâtiment modulaire-45120 Châlette-sur-Loing2020 · maximum over 6 months28€kConstruction d’un groupe scolaire avec plateau sportif à Vesines2018 · maximum over 16 months1.7€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 1

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.