Skip to main content

Public contracts of Châlette-sur-Loing · 2020 · Construction and buildings

Déplacement d’un bâtiment modulaire-45120 Châlette-sur-Loing

€28k
maximum contract amount over 6 months — what was paid on it is not published
Signed on 23 December 2020 · ended around June 2021 · 6 months

Company selected

Établissements Pierre RevilTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Pannes (45700) · headcount 50 to 99 employees · SIREN 309979813

Number 8 by amount of the 10 contracts Châlette-sur-Loing published for 2020.

Other contracts of Établissements Pierre Revil in Châlette-sur-Loing

Construction du complexe sportif Paul Éluard2025 · maximum over 15 months1.9€MConstruction d’un groupe scolaire avec plateau sportif à Vesines2018 · maximum over 16 months1.7€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.