Réhabilitation du laboratoire de chimie des eaux du Laboratoire Départemental de la Côte-d'Or à Dijon

Gros œuvre

€129k
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 24 July 2024 · running until about December 2026 · 2.5 yrs
Ongoing24 Dec 2026

That is at most ~€53k a year on average: a maximum too.

Company selected

R ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Dijon (21000) · headcount 20 to 49 employees · SIREN 389827916

A contract awarded to 2 holders; above, the main holder. With it: Maisons GMC. The amount is the whole contract’s: the DECP does not publish each holder’s share.

The competition

4 bids received

Median for this procedure in 2024: 3 bids, across 48385 comparable contracts. Simplified procedure · awarded to 2 companies

Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.

Number 104 by amount of the 246 contracts the Côte-d'Or département published for 2024.

Other contracts of R Construction in Côte-d'Or

Collège Boris Vian à Talant2024 · maximum over 4 months82€kConstruction d’un préau · R construction2024 · maximum over 4 months56€kCollège Marcel Aymé à Marsannay-la-Côte2022 · maximum over 9 months116€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 1

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.