Skip to main content

Public contracts of the Drôme département · 2019

RD 518-Ancien tunnel du Col du Rousset

Étude de faisabilité pour une remise en état

€99k
maximum contract amount over 6 months — what was paid on it is not published
Signed on 15 November 2019 · ended around May 2020 · 6 months

Who won it

Laboratoire Études Recherche MateriauxIngénierie, études techniques · registered office Arles (13200) · headcount 50 to 99 employees · SIREN 344297775

A contract awarded to 3 holders; above, the main holder. With it: Setec Amenagements Lineaires et Structures - Setec Als, Setec Diades. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 74 by amount of the 164 contracts the Drôme département published for 2019.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.