Skip to main content

Public contracts of the Eure département · 2022

Reconstruction et réhabilitation/extension du collège Simone Signoret à Val d’Hazey

Démolition des étanchéités existantes

€123k
maximum contract amount over 13 months — what was paid on it is not published
Signed on 22 March 2022 · ended around April 2023 · 13 months

That is at most ~€114k a year on average: a maximum too.

Who won it

C.B.E.M.Travaux de maçonnerie générale et gros œuvre de bâtiment · registered office Val-De-Reuil (27100) · headcount 10 to 19 employees · SIREN 408091098

The competition

1 bid received

awarded to 1 company

Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.

Number 48 by amount of the 71 contracts the Eure département published for 2022.

Other contracts of C.B.E.M. in Eure

Construction de la nouvelle demi-pension et restructuration du collège…2022 · maximum over 2 years145€kReconstruction et réhabilitation/extension du collège Simone Signoret à…2021 · maximum over 2.5 years528€kTravaux d’étanchéité et de réfection de toitures au CIS La…2021 · maximum over 8 months318€k
Contract details (procedure, price, amendments, lots)

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.