Skip to main content

Public contracts of the Haute-Saône département · 2023

Construction d’un bâtiment de stockage de pneumatiques à l’UTS de Vesoul

€73k
maximum contract amount over 5 months — what was paid on it is not published
Signed on 10 October 2023 · ended around March 2024 · 5 months

Who won it

Rodeschini SASTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Scey-Sur-Saone-Et-Saint-Albin (70360) · headcount 20 to 49 employees · SIREN 300846540

Number 54 by amount of the 100 contracts the Haute-Saône département published for 2023.

Other contracts of Rodeschini SAS in Haute-Saône

Gros Œuvre2021 · maximum over 18 months838€kExtension de la demi-pension du collège Château Rance de Scey-Sur-Saône2021 · maximum over 6 months29€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.