Skip to main content

Public contracts of the Hérault département · 2020

Aménagement piste DFCI programme 2020-secteur coeur d’Hérault

€147k
maximum contract amount over 1 month — what was paid on it is not published
Signed on 31 August 2020 · ended around September 2020 · 1 month

Who won it

Baldare SARLTravaux de terrassement courants et travaux préparatoires · registered office Saint-Pierre-De-La-Fage (34520) · headcount 20 to 49 employees · SIREN 420435638

Number 39 by amount of the 74 contracts the Hérault département published for 2020.

Other contracts of Baldare SARL in Hérault

Curages de fosses de bassins et retenue et dérasement2024 · maximum over 4 years800€kRD 144 saint jean de la blaquiere recalibrage tranche 2 pr 4+530 a 4+8302021 · maximum over 1 month89€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.