Public contracts of the Indre-et-Loire département · 2021
Extension et réhabilitation de la demi-pension du collège célestin freinet
Sainte MAURE de touraine
That is at most ~€257k a year on average: a maximum too.
Company selected
Briault ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Nazelles-Negron (37530) · headcount 20 to 49 employees · SIREN 389193392Number 14 by amount of the 155 contracts the Indre-et-Loire département published for 2021.
Other contracts of Briault Construction in Indre-et-Loire
Extension restructuration demi pension collège montaigne démolition GO…2022 · maximum over 16 months412€kExtension et restructuration de la demi-pension du collège Val de…2021 · maximum over 21 months615€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Révisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.