Skip to main content

Public contracts of the Indre département · 2021

079 Mo pont sur la bouzanne a Tendu-Mission de maîtrise d'œuvre pour la reconstruction partielle du pont sur La Bouzanne

Route Départementale 920-PR 59+900 sur la Commune de TENDU

€105k
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 4 January 2021 · ended around September 2023 · 2.5 yrs

That is at most ~€39k a year on average: a maximum too.

Who won it

Cabinet d'Études Marc MerlinIngénierie, études techniques · registered office Lyon (69002) · headcount 250 to 499 employees · SIREN 428634356

A contract awarded to 3 holders; above, the main holder. With it: Bureau d'Études DB, MC.K.ARCHI. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 74 by amount of the 139 contracts the Indre département published for 2021.

Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.