Skip to main content

Public contracts of the Lot-et-Garonne département · 2024

Travaux de construction d’un bâtiment d’exploitation pour les installations du transbordeur de Fumel

Gros oeuvre maçonnerie assainissement

€160k
maximum contract amount over 12 months — what was paid on it is not published
Signed on 12 September 2024 · ended around September 2025 · 12 months

Who won it

BTP Ustulin PhilippeTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Castelmoron Sur Lot (47260) · headcount 20 to 49 employees · SIREN 792745481

Number 34 by amount of the 95 contracts the Lot-et-Garonne département published for 2024.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.