Geotec Énergie
Geotec Énergie holds 2 public contracts awarded by the Maine-et-Loire département between 2023 and 2024.
head office in Quetigny (21) · 10 to 19 employees · Forages et sondages · SIREN 478522477
€515k
at most, over the whole term of the contracts awarded by the Maine-et-Loire département since 2023
What Geotec Énergie does in Maine-et-Loire
Maximum amount of each contract, over its whole term: not what was paid.
Travaux de réhabilitation de la chaufferie du collège Clément Janequin…Mix géothermie / gaz naturel · Forage · Géothermie · 2024 · maximum over 7 months · Simplified procedure€315kRéhabilitation de la chaufferie du collège Les Fontaines par un mix…"Forage · Géothermie" · 2023 · maximum over 8 months · Simplified procedure€200kRegions, départements, intercommunalities
Geotec Énergie also holds contracts awarded by one other body, worth €197k.
In towns
Geotec Énergie holds contracts in 10 towns, worth €1.8M at award.