Skip to main content

Public contracts of the Marne département · 2019

Construction d’un hangar de maintenance avions sur l’aeroport paris-Vatry

€2.7M
maximum contract amount over 21 months — what was paid on it is not published
Signed on 15 March 2019 · ended around December 2020 · 21 months

That is at most ~€1.6M a year on average: a maximum too.

Who won it

Castel et FromagetFabrication de structures métalliques et de parties de structures · registered office Fleurance (32500) · headcount 250 to 499 employees · SIREN 342732351

A contract awarded to 4 holders; above, the main holder. With it: Kardham, Bec Construction Champagne, Kardham Architecture (Amsycom Artay Architecture - Artay Architecture). The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 6 by amount of the 105 contracts the Marne département published for 2019.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : 2

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.