Skip to main content

Public contracts of Métropole de Lyon · 2019

Construction d’un réseau séparatif et création d’un bassin de rétention et d’infiltration et de tranchée d’infiltration, ZI du Lyonnais à St Priest 2 lots

€130k
maximum contract amount over 12 months — what was paid on it is not published
Signed on 5 March 2019 · ended around March 2020 · 12 months

Who won it

Entreprise CholtonConstruction de réseaux pour fluides · registered office Chabaniere (69440) · headcount 100 to 199 employees · SIREN 674501267

Number 97 by amount of the 128 contracts Métropole de Lyon published for 2019.

Other contracts of Entreprise Cholton in Métropole de Lyon

Rillieux la Pape2025 · maximum over 2.5 years1.6€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.