Skip to main content

Public contracts of Métropole de Lyon · 2020

Opération de construction du collège Cusset Bonnevay à Villeurbanne

Plâtrerie · Peinture · Faux-plafonds

€962k
maximum contract amount over 20 months — what was paid on it is not published
Signed on 4 August 2020 · ended around April 2022 · 20 months

That is at most ~€577k a year on average: a maximum too.

Who won it

MeunierTravaux de peinture et vitrerie · registered office Vaulx-En-Velin (69120) · headcount 20 to 49 employees · SIREN 323287334

A contract awarded to 3 holders; above, the main holder. With it: Courtadon, Botta. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 32 by amount of the 165 contracts Métropole de Lyon published for 2020.

Other contracts of Meunier in Métropole de Lyon

Travaux sur les biens immobiliers de la Métropole de Lyon2024 · maximum over 4 years5€M
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.