Skip to main content

Public contracts of the Morbihan département · 2026

Maîtrise d’oeuvre pour rehbilitation bâtimentaire au collège kerdurand a riantec

€142k
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 23 March 2026 · running until about September 2028 · 2.5 yrs
Ongoing21 Sept 2028

That is at most ~€57k a year on average: a maximum too.

Who won it

Armor ÉconomieActivité des économistes de la construction · registered office Lorient (56100) · headcount 20 to 49 employees · SIREN 394081947

A contract awarded to a consortium of 4 holders; above, the main holder. With it: Structures en Beton Arme, Bureau d'Etude Cooperatif pour la Maitrise de l'Énergie 56 (Become 56), Bleher Architectes. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 68 by amount of the 103 contracts the Morbihan département published for 2026.

Other contracts of Armor Économie in Morbihan

COL ploemeur2021 · maximum over 3 years53€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.