Public contracts of the Seine-Maritime département · 2019

Restructuration extension de la demi-pension du collège Masséot Abaquesne à Boos

€84k
maximum contract amount over 16 months — what was paid on it is not published
Signed on 22 May 2019 · ended around September 2020 · 16 months

That is at most ~€63k a year on average: a maximum too.

Who won it

OisselecTravaux d'installation électrique dans tous locaux · registered office Oissel (76350) · headcount 20 to 49 employees · SIREN 329845507

Number 82 by amount of the 241 contracts the Seine-Maritime département published for 2019.

Other contracts of Oisselec in Seine-Maritime

Adap Vague 2-Territoire Rouen Sud2022 · maximum over 8 months74€kCollège Branly à Grand-Quevilly2022 · maximum over 4 months33€kCollège Paul Bert à Fécamp2020 · maximum over 5 months36€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.