Skip to main content

Public contracts of the Seine-Maritime département · 2019

Restructuration extension de la demi-pension du collège Masséot Abaquesne à Boos

€375k
maximum contract amount over 16 months — what was paid on it is not published
Signed on 22 May 2019 · ended around September 2020 · 16 months

That is at most ~€281k a year on average: a maximum too.

Who won it

T 2 C - Technique et Concept de la ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Franqueville-Saint-Pierre (76520) · headcount 50 to 99 employees · SIREN 412206757

Number 25 by amount of the 241 contracts the Seine-Maritime département published for 2019.

Other contracts of T 2 C - Technique et Concept de la Construction in Seine-Maritime

Ad’Ap vague 3-Zone Rouen 2 collèges Pablo Picasso, Louise Michel…2026 · maximum over 12 months394€kConstruction d’une demi-pension et restructuration de locaux au collège…2023 · maximum over 2 years975€kConstruction d’un bâtiment demi-pension et d’un pôle logistique…2019 · maximum over 21 months1.1€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.