Public contracts of Dzaoudzi · 2021 · Construction and buildings
Travaux de réhabilitation de l’école maternelle Moya
Faux plafond
That is at most ~€69k a year on average: a maximum too.
Company selected
S.T.R SARLConstruction d'autres bâtiments · registered office Mamoudzou (97600) · SIREN 519082192Number 30 by amount of the 61 contracts Dzaoudzi published for 2021. It belongs to the policy Schools.
Other contracts of S.T.R SARL in Dzaoudzi
Travaux de réhabilitation de l’école maternelle Moya2021 · maximum over 18 months204€kTravaux de réhabilitation de l’école maternelle Moya2021 · maximum over 18 months63€kCréation de vestiaires/sanitaires/requalification de l’entrée…2021 · maximum over 3 years43€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Ferme et actualisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.