Skip to main content

Public contracts of Dzaoudzi · 2021 · Construction and buildings

Travaux de réhabilitation de l’école maternelle Moya

Peinture

€63k
maximum contract amount over 18 months — what was paid on it is not published
Signed on 3 October 2021 · ended around April 2023 · 18 months

That is at most ~€42k a year on average: a maximum too.

Company selected

S.T.R SARLConstruction d'autres bâtiments · registered office Mamoudzou (97600) · SIREN 519082192

Number 49 by amount of the 61 contracts Dzaoudzi published for 2021. It belongs to the policy Schools.

Other contracts of S.T.R SARL in Dzaoudzi

Travaux de réhabilitation de l’école maternelle Moya2021 · maximum over 18 months204€kTravaux de réhabilitation de l’école maternelle Moya2021 · maximum over 18 months103€kCréation de vestiaires/sanitaires/requalification de l’entrée…2021 · maximum over 3 years43€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.