Public contracts of Évry-Courcouronnes · 2023 · Construction and buildings
Travaux de construction d’un pôle enfance au parc des loges et d’une triibune et locaux sportifs a bois sauvage
That is at most ~€504k a year on average: a maximum too.
Company selected
Terre et Pierre IDFTravaux de terrassement courants et travaux préparatoires · registered office Elancourt (78990) · headcount 10 to 19 employees · SIREN 828689141Number 40 by amount of the 197 contracts Évry-Courcouronnes published for 2023. It belongs to the policy Culture, sport and youth.
Other contracts of Terre et Pierre IDF in Évry-Courcouronnes
Terrassement2023 · maximum over 3.5 years696€kContract details (procedure, price, amendments, lots)
Procedure : Appel d'offres ouvert
Price : Révisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.