Bordeaux Métropole · Gironde · Nouvelle-Aquitaine · 24,756 residents · Mayor: Christine Bost
Eysines
€33.8 million spent in 2025.
€1,365 per resident · Towns of the same size: €1,855
Eysines’s spending by policy area
Click a line to see what it pays for
The 5 other items (2%)
Source: the town’s 2025 accounts (DGFiP), by public policy.
Where the money goes
The €33.8M spent in 2025, by who receives it.
Source: the town’s 2025 accounts (DGFiP).
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid. Purchases, services and works paid to companies by the town in 2025: €12.8M (its accounts).
Click a name to see its contracts
- Sogeres2 contracts over 4 to 4 years · at most ~€588k a year on average · framework agreements: maximum envelopesup to €2.4M
- Eurovia Gironde4 contracts over 2 months to 18 months · at most ~€942k a year on averageup to €1.2M
- JSD Entreprise2 contracts over 18 months · at most ~€795k a year on averageup to €1.2M
- Metalneo2 contracts over 18 months · at most ~€526k a year on averageup to €790k
- SARL Serset (Serset)2 contracts over 18 months · at most ~€454k a year on average · 1 with other holdersup to €680k
- CVP 332 contracts over 2 months to 3 months · 1 of them a framework agreement (maximum envelope)up to €466k
- Établissements Laurent2 contracts over 18 months · at most ~€249k a year on averageup to €374k
69 contracts signed in 2025 · €11M before tax · All contracts
Why this total differs from the €12.8M of purchases, services and works paid to companies
These are the amounts of the contracts signed in the year, over their whole length, not what was paid. The money paid in a year also goes to older contracts and to purchases too small to be published (under €40,000 excl. VAT). For a framework agreement, the amount is a ceiling.
Investment and works
€6.2M of capital spending in 2025 (building, renovation, equipment), €249 per resident. Towns of the same size: €372.
Click a building site to see the contract
- Le présent marché à pour objet les travaux relatifs à la création de la Maison des Générations et son parc dans le centre bourg d’Eysines2025 · 12 contracts€1.4M
- Construction d’une maison des générations2025 · 3 contracts€1.2M
- Maison des Générations et son parc2025 · 2 contracts€991k
- Maîtrise d’œuvre pour la construction d’un gymnase, ZAC Cantinolle2024 · Culture, sport and youth · Marjan Hessamfar-Joe Verons Architectes Associes€791k
- Création et aménagement d’espaces verts2024 · Town planning and housing · JBL Espaces Verts€650k
Largest works contracted since 2023, among published contracts. Amounts planned at signature, often spread over several years.
In addition, €142k given to other bodies for their own equipment (joint funding, energy syndicate…).
Source: the town’s 2025 accounts (DGFiP), by public policy.
Revenue and financing
Revenue: €30.9M · borrowing: €3M · spending: €33.8M.
Source: the town’s 2025 accounts (DGFiP).
Debt and taxation
Accounts 2025, main budget (excluding annex budgets such as water), except debt and savings: main and annex budgets together (OFGL consolidated accounts). Per resident: amount divided by the total population (Insee, in force in the year of the accounts). Sources: DGFiP, OFGL. “Towns of the same size”: median of the 359 towns of 20,000 to 50,000 inhabitants.
Who spends for the residents of Eysines
Spending per resident in 2025 of each public body the town belongs to, and what each one pays for.
- TownEysinesPrimary schools, canteens, local streets, civil registry€1,365 per resident
- IntercommunalityBordeaux MétropoleWaste, water, urban transport, economic development€1,706 per resident
- DépartementGirondeMinimum income, elderly and disability care, middle schools, county roads€1,191 per resident
- RegionNouvelle-AquitaineHigh schools, regional trains, training, business support€519 per resident
Each amount is what the body spends per resident, from its accounts (DGFiP). Do not add them up: part of the money passes from one body to another.
Understanding these figures
Running costs and works: what is the difference?
Running costs are each year’s spending: wages, energy, upkeep, grants. Works create or renovate something that lasts: a school, a road, a sports hall.
How is the comparison with towns of the same size made?
The towns of 20,000 to 50,000 inhabitants are ranked from lowest to highest value; the median is the value in the middle. A value above or below the median is not a judgement: it depends on the area, the population and the powers held by the intercommunality.
Where do these figures come from?
From the town’s accounts kept by the public accountant (DGFiP), the local finance observatory (OFGL) and public procurement data. Qipu changes no amount.
Elected officials and staff of Eysines: to report a figure to correct or add context, write to Qipu.
Compare with Le Bouscat or with another town:
Page published by Qipu, independent of the town · Sources and method
DGFiP balance-sheet accounts (nature axis) · OFGL (consolidated towns base) · Public procurement — DECP (data.gouv.fr) · National register of elected officials, archived versions 2020-2025 · 2025. The method · See the source