
Bordeaux Métropole · Gironde · Nouvelle-Aquitaine · 26,583 residents · Mayor: Michel Labardin
Gradignan
€46 million spent in 2025.
€1,731 per resident · Towns of the same size: €1,855
Gradignan’s spending by policy area
Click a line to see what it pays for
The 7 other items (4%)
Source: the town’s 2025 accounts (DGFiP), by public policy.
Where the money goes
The €46M spent in 2025, by who receives it.
Source: the town’s 2025 accounts (DGFiP).
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid. Purchases, services and works paid to companies by the town in 2025: €19M (its accounts).
Click a name to see its contracts
- Art-Dan1 contract over 4 monthsup to €889k
- Lacoste2 contracts over 4 years · at most ~€162k a year on average · framework agreements: maximum envelopesup to €649k
- Petit Forestier Location1 contract over 4 years · at most ~€55k a year on average · framework agreement: maximum envelopeup to €219k
- Euro Location1 contract over 5 years · at most ~€43k a year on averageup to €215k
- Denis Papin Collectivites1 contract over 2 years · at most ~€108k a year on average · framework agreement: maximum envelopeup to €215k
- Colas France1 contract over 4 years · at most ~€54k a year on average · framework agreement: maximum envelopeup to €215k
- Établissement Houdusse Picard1 contract over 2 years · at most ~€81k a year on average · framework agreement: maximum envelopeup to €162k
32 contracts signed in 2025 · €3.9M before tax · 1 contract (€115k) left out of the total: a copied or out-of-scale ceiling, or a duplicate publication · All contracts
What the town paid in 2025 for these kinds of purchase, from its accounts
- Office and school suppliesall suppliers together · contract in the list: Lacostepaid €125k
- Vehicle purchasesall suppliers together · contract in the list: Petit Forestier Locationpaid €113k
The accounts say how much was paid for each kind of purchase, not to which company. A purchase paid by another public body (joint order, shared service) is not in them.
Why this total differs from the €19M of purchases, services and works paid to companies
These are the amounts of the contracts signed in the year, over their whole length, not what was paid. The money paid in a year also goes to older contracts and to purchases too small to be published (under €40,000 excl. VAT). For a framework agreement, the amount is a ceiling.
Investment and works
€10.7M of capital spending in 2025 (building, renovation, equipment), €404 per resident. Towns of the same size: €372.
Click a building site to see the contract
- Construction d’un groupe scolaire au centre-ville2023 · Schools · 5 contracts€4.8M
- Groupe scolaire du centre-ville de Gradignan : murs-rideaux et menuiseries extérieures2023 · Schools · Société Bourneuf€2.2M
- Construction d’un groupe scolaire à Gradignan : menuiseries intérieures, agencement2023 · Schools · Ridoret Menuiserie (Aocm Menuiserie - Ser)€1.2M
- Terrain de football en gazon synthétique, plaine de Mandavit2025 · Art-Dan€889k
- Restauration du four bouteille de la Poterie : échafaudages, gros œuvre, taille de pierre2023 · Entreprise Hory-Chauvelin€551k
Largest works contracted since 2023, among published contracts. Amounts planned at signature, often spread over several years.
In addition, €91k given to other bodies for their own equipment (joint funding, energy syndicate…).
Source: the town’s 2025 accounts (DGFiP), by public policy.
Revenue and financing
Revenue: €38.7M · borrowing: €2.8M · spending: €46M.
Source: the town’s 2025 accounts (DGFiP).
Debt and taxation
Accounts 2025, main budget (excluding annex budgets such as water), except debt and savings: main and annex budgets together (OFGL consolidated accounts). Per resident: amount divided by the total population (Insee, in force in the year of the accounts). Sources: DGFiP, OFGL. “Towns of the same size”: median of the 359 towns of 20,000 to 50,000 inhabitants.
Who spends for the residents of Gradignan
Spending per resident in 2025 of each public body the town belongs to, and what each one pays for.
- TownGradignanPrimary schools, canteens, local streets, civil registry€1,731 per resident
- IntercommunalityBordeaux MétropoleWaste, water, urban transport, economic development€1,706 per resident
- DépartementGirondeMinimum income, elderly and disability care, middle schools, county roads€1,191 per resident
- RegionNouvelle-AquitaineHigh schools, regional trains, training, business support€519 per resident
Each amount is what the body spends per resident, from its accounts (DGFiP). Do not add them up: part of the money passes from one body to another.
Understanding these figures
Running costs and works: what is the difference?
Running costs are each year’s spending: wages, energy, upkeep, grants. Works create or renovate something that lasts: a school, a road, a sports hall.
How is the comparison with towns of the same size made?
The towns of 20,000 to 50,000 inhabitants are ranked from lowest to highest value; the median is the value in the middle. A value above or below the median is not a judgement: it depends on the area, the population and the powers held by the intercommunality.
Where do these figures come from?
From the town’s accounts kept by the public accountant (DGFiP), the local finance observatory (OFGL) and public procurement data. Qipu changes no amount.
Elected officials and staff of Gradignan: to report a figure to correct or add context, write to Qipu.
Compare with Cenon or with another town:
Page published by Qipu, independent of the town · Sources and method
DGFiP balance-sheet accounts (nature axis) · OFGL (consolidated towns base) · Public procurement — DECP (data.gouv.fr) · National register of elected officials, archived versions 2020-2025 · 2025. The method · See the source