Public contracts of Hyères · 2021 · Construction and buildings
Bâtiments
Construction du club house de rugby au stade André Véran
That is at most ~€39k a year on average: a maximum too.
Company selected
SnefTravaux d'installation électrique dans tous locaux · registered office Marseille 15Eme (13015) · headcount 2,000 to 4,999 employees · SIREN 056800659Number 52 by amount of the 61 contracts Hyères published for 2021. It belongs to the policy Culture, sport and youth.
Other contracts of Snef in Hyères
Chauffage et climatisation2025 · maximum over 4 years2.9€MRéparation : ventilation2025 · maximum over 3.5 years2.3€MPatrimoine bâti2025 · maximum over 3.5 years1.9€MContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Ferme et actualisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.