Public contracts of Hyères · 2021 · Construction and buildings

Bâtiments

Construction du club house de rugby au stade André Véran · Courants forts · Courants faibles · Système Sécurité Incendie

€72k
maximum contract amount over 22 months — what was paid on it is not published
Signed on 3 December 2021 · ended around October 2023 · 22 months

That is at most ~€39k a year on average: a maximum too.

Company selected

SnefTravaux d'installation électrique dans tous locaux · registered office Marseille 15Eme (13015) · headcount 2,000 to 4,999 employees · SIREN 056800659

Number 51 by amount of the 61 contracts Hyères published for 2021. It belongs to the policy Culture, sport and youth.

Other contracts of Snef in Hyères

Chauffage et climatisation2025 · maximum over 4 years2.9€MRéparation : ventilation2025 · maximum over 3.5 years2.3€MPatrimoine bâti2025 · maximum over 3.5 years1.9€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.